Monday, June 3, 2013

Quick Update in Pics

Bath 3 (jack/jill) Serene White tile w/Nautilus Brick Conch listello

Bath 2 - 6x6 white tiles with the ivy listello

Master Bath - Brancacci Windrift Beige (diagonal)

Master Bath

Master bath shower - Stone Radiance SA54 Wisteria/Tortoise Random Mosaic listello

master bath

master bath

dining room lights


foyer

powder room - Bruce Manchester Cherry 2 1/4" strip

dining room
 




Saturday, May 25, 2013

Question for those with the stone fireplace

This week (yesterday) they installed the stone facade on the fireplace.  I think they did a pretty good job on the stone but the mortar is pretty bad.  The sides are dark/messy and there are some serious stains on the pretty hearth stone.  Does anyone with the stone fireplace have any staining issues on their hearth, as shown below???   How do they finish the edges?







I wanted to catch them before they installed the mantle because I wanted it lower (or not at all) to be able to mount the TV a little lower but they had it done too quickly.  

I  was also disappointed to see there wasn't any stone leftover (and there's no dumpster in our yard anymore so no diving).  I guess I'll need to ask PM to get a couple of extra pieces.  I would like the extras to use to cover the TV hookup hole if I ever want to take the TV down in the future.

Update (long overdue)

Just wanted to do a quick update with pics.  Last weekend they installed some of our trim, kitchen and bath cabinets and the doors (so awesome to walk in an see).  This week, they did the siding and shutters and another coat of paint.  I'm so excited to be close to the 30-day mark.  So ready for this process to be over.

We did get a tenant for our current home this week!  That's a big relief and now I can start the heavy-duty packing!!!

There was an issue I had to deal with this week concerning the kitchen granite - in the end, I had to pick another color but it's a long story for a separate post.
 




dining room




bedroom 3 and linen closet

loving the tray ceiling in the master

there's a  LOT of holes in the upper hall ceiling!
fireplace w/ bucks county ledgestone

shadowy basement :)

fireplace w/bucks county ledgestone

Wednesday, May 15, 2013

Dates!

Now that we've passed the Energy Star test, PM has provided our estimated walk-through and closing dates.  As of now, we are looking at our walk-through on June 21st and closing June 28th!  Those are both Fridays, and I have to admit I'm a little nervous about closing on a Friday (no "next day" cushioning so NVR better be on their toes).  Very exciting now.

Speaking of NVR, I was told that they will probably let me lock starting the beginning of next week so (little does she know) I'll be making daily calls to our loan officer to check rates and credit points.  I immensely dislike the rate roulette game and am looking forward to having that part over with :)

I'll be going through tonight to check their progress on the drywall.  I kind of lost some excitement because I wasn't pleased AT ALL with some of the quality issues I saw when the drywall went up.  I think they moved way too fast with no thought to doing it right.  Drywall is an art and not everything can be covered up by tape and spackle.  There were quite a few pieces of drywall that were so damaged or poorly installed that I would hope they have the decency to replace them...  Is it wrong to want nice smooth, even walls?  I don't think so...  I've also found issues with electrical wiring shortcuts, a crooked sump pump and other miscellaneous items.  Think it's about time for another meeting with PM :)