Wednesday, May 1, 2013

End of First Month

Between last Friday and today, they got the plumbing and HVAC mostly complete, as well as a good start on the electric.  Guardian should be out Friday and next week are inspections, insulation and possibly drywall!  PM said he will give the "main office" his target completion date after the Energy Star inspection (don't know when that is though).  PM also mentioned there's been a delay with our brick, saying there was something about a supply problem, so I hope that comes in soon.

Current pics, in random blogger order.  I couldn't get too many because my memory card ran out of space (and the kids were getting bored)...

garage windows/door, kitchen windows and master bedroom above

drain for the welled exit waiting to be installed
study, living room and bedroom 3 above (the small window is the jack/jill bath)
  
garage steps
kitchen, they've already marked for the cabinets

kitchen island

view out of the window above the kitchen sink

kitchen wall (double ovens and refrigerator) looking into mud room and garage

family room - "HOLE" marked for drywall hatch
that wall is into the study (the one we want to insulate)
We learned that they get the drywall into the basement via a hole in the family room floor (our neighbor's was in the living room).  This is true even though we have the double welled walkout in the basement... Strange.  We also learned that they don't screw down our subfloors, just nails and glue.  Think I will still want to try to drive in some screws at some point, at least on the first floor under the hardwood.

Insulation:  We were too late to order Roxul so we just purchased some regular insulation hoping that something will be better than nothing.  I did hear from a reliable source that the Roxul does some for the sound, but it's mainly the high pitches - does not really do anything for the lows.  I also am going to get a quote from the insulation contractor to see how much they will charge to insulate the garage and between bedroom 4 and the master.  We only purchased enough insulation to do between the study and family room.  I think insulating will be a little harder than I thought because the studs are not standard/uniform so we will have to cut the edges down (the spacing between our studs varies by an inch or so in some places).  I though it would be simple to just roll in between the studs cut the bottom and staple the sides.  We also don't have 16" on center interior walls, it looks like they did them for 24" on center; meaning I'll never be able to find a stud to hang things :)

We had a meeting with PM this afternoon to discuss some framing issues and the electrician was there.  I won't even go into the fact that I asked PM last week to let me know about the electrician's schedule (because I wanted to be there to make a few changes).  But I'm glad we caught him.  I was able to get the recessed lights above the kitchen island installed on their own separate switch.  I was surprised to find there are only two lights over the island - I could of sworn there were three.  But two is correct, according to the blueprints (had to triple-check).  Because the electrician had already done upstairs, there was only one switch move that I wanted and could not get. Guess that's not too bad.

Friday, April 26, 2013

Days 18-23 Moving Right Along (update with pics)

I've slacked this week on the blog.  Time is really flying - which is a GOOD thing during this process.  They've made a lot of progress this week.

Windows and doors were installed, then we got our stairs on Monday (which had been hanging out in our neighbor's garage).  My mom and I took our first "full" house tour Monday night :).  They also completed the house wrap and roof, and yesterday evening I was watching the guy install the garage door. It's really coming along.

Along with the blog slacking, I let time sneak up on me and haven't yet ordered the Roxul (insulation) that I want to use in the walls between a couple of rooms and around some of the plumbing areas.  I hope I am able to get it in time then I'll have to make sure I catch the small window of opportunity there is to get in and get the DIY insulation done.


here's what it looked like: Thursday 4/25


back view 4/25
morning room

closet of bedroom 4 looking into foyer

bedroom 2 (my future "me" room)

looking into the master bath

bedroom 4
bedroom 3




hard to get a pic of this side - master bedroom side
I like this pic - the sunset reflecting off the side

For Amy:  another half a lime in the midst of all the other debris; still no Corona :)


Speaking of construction debris/trash - is anyone else's lot just a disaster???  There is so much trash and junk strewn about...  I certainly hope the indoor crew isn't that messy :(

Friday, April 19, 2013

Day 17: Major Framing=Done


Keeping up the pace they got the roof done today, along with installing some random windows.
They also fixed the framing for a side living room and study window as well as created additional framing for another window in each of those rooms (separate post about the windows coming soon).  


I'm blown away by how fast they went, but I can't help but wonder if I should be thinking about the quality.  Guess I'll be able to catch the details as the build progresses - right now I'm just too happy :)

I arrived at about 6:30, just as they were finishing up and leaving.  There were a lot of dark clouds coming (was supposed to storm this evening) but the rain held off just long enough so I could take a tour inside :)


family room, morning room in the back of the pic

study

love this pic - that's a lot of wood
standing in the foyer looking up to bed 2 on the right and door to master and bed 4 on left

future site of front door and foyer window


dining room

living room


no, my yard is not this big :(
I'm standing on the tot lot behind my house


Thursday, April 18, 2013

Day 16: Framing continues...